Pipeline
CRM Sync
Aiera writes to the CRM, it does not replace it. This page is the integrity check on that write path — what synced, what failed and what quietly drifted.
Records synced
38,410
90 days, all objects
Write success
99.2%
+1.4 ptsTwelve-week shape, pilot window
Failed writes
308
All retried, 12 unresolved
Sync lag, p95
42s
Twelve-week shape, pilot window
Ranked by records
Top rows from the table below, largest first
Read off the same table, sorted so the concentration is visible. Ties are ordered as they appear in the register.
Data quality after sync
The weakest field in the whole system
Sync by object
| Object | Direction | Records | Success | Failures | p95 lag |
|---|---|---|---|---|---|
| Lead | Aiera → CRM | 15,200 | 99.6% | 61 | 18s |
| Call activity | Aiera → CRM | 11,840 | 99.4% | 71 | 26s |
| WhatsApp thread | Aiera → CRM | 6,920 | 98.8% | 83 | 51s |
| Site visit | Two-way | 1,784 | 99.1% | 16 | 42s |
| Opportunity | CRM → Aiera | 2,180 | 98.4% | 35 | 63s |
| Inventory | CRM → Aiera | 486 | 95.3% | 42 | 5m 10s |
Where the truth lives
CRM is the system of record for the deal
Aiera never overwrites a stage a human set. Conflicts are logged and surfaced, not resolved silently.
Inventory is the weakest link
A 95.3% sync on 486 units still means unit statuses can be wrong for hours. Do not quote availability from a stale screen.
Recent sync incidents
Inventory feed stale for 6 hours
14 MarDeveloper SFTP drop failed overnight; 42 unit statuses were wrong until the morning re-pull.
WhatsApp thread duplication
06 MarA retry loop wrote 210 duplicate messages. Deduplicated and the retry key was fixed.
Owner assignment gap
27 FebLeads created between 2am and 4am had no owner until the rota job ran. Now assigned at write time.
How to read this page
Pipeline · CRM Sync
Window
Rolling 90 days of the India Realty pilot, refreshed nightly at 02:00 IST.
Sources
Aiera call logs, WhatsApp Business API, CRM stages, Meta and portal spend exports.
Joins
Every number is joined to a booking where one exists, not to leads, so cost lines stay comparable.
Limits
Ninety days is short for a ₹1.5 Cr purchase. Late-window cohorts are still open, so treat conversion as a floor.
